American Tobacco Waterline Replacement Phase 2
Consists of the installation of approximately 11,500 linear feet of 6-inch to 16-inch DIP waterline, installation of 5,000 linear feet of 36-inch DIP waterline, replacement of existing domestic and fire services, approximately 3,200 linear feet of 8-inch to 16-inch sanitary sewer replacement, selected sanitary sewer point repairs, selected sanitary sewer service conflict resolution, sanitary sewer manholes, sanitary sewer CIPP lining, connections to existing piping, valve assemblies, traffic control, miscellaneous surface restoration and all associated appurtenances, as described in the Specifications and shown on the Drawings.
Plan Holders
Date | Company | Contact |
4/1/25 4:26 pm |
JF Wilkerson
10710 Chapel Hill Rd Morrisville, NC 27560 |
Tim Hogan
Tel: 9194671829
Fax: 919-467-6269
|
4/2/25 3:07 pm |
Moffat Pipe Inc.
701 Finger Lakes Dr Wake Forest, NC 27604 |
Jacob King
Tel: 919-295-4630
Fax: 919-295-4631
|
4/3/25 7:19 am |
Park Construction of NC, Inc.
PO Box 500 416 Airport Blvd Morrisville, NC 27560 |
Jack Harte
Assistant Estimator
Tel: 919-812-2615
Fax: 919-319-8835
|
4/3/25 7:16 am |
TA Loving
2204-F Associate Drive Raleigh, NC 27603 |
Dustin Downie
Tel: 919-750-3822
|
4/3/25 12:01 am |
Teraflex Group, LLC
217 Branner Ave Waynesville, NC 28786 |
John Patrick
Vice President
Tel: 9196096114
|
4/1/25 5:24 pm |
Thalle Construction Co, Inc
900 NC HWY 86 North Hillsborough, NC 27278 |
Pricella Andrew
Tel: 9192451490
Fax: 919-241-1635
|