Water Street Transformation Project

The Project spans Water Street from the intersections of Ehringhaus to Main Streets. The Project elements include demolition, removal, and replacement of existing, deteriorated sidewalk on both sides of Water Street between these intersections, with the southern terminus of the eastern sidewalk connecting to Waterfront Park. Replaced sidewalk should be the same width and height as current sidewalk, unless inadvisable due to settlement or other factors. The Project will also install new sidewalk eastward to connect Main Street to Moth Boat Park.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2024-10-09_WSTP_Addendum1 16.0 MB