Seaboard Station Utility Improvements

Furnish and install approximately 850 LF of 8” through 15” SDR 26 PVC Sanitary Sewer to be installed by open cut. Furnish and install approximately 120 LF of 16” DR-18 C900 Sanitary Sewer to be installed by open cut within CSX R/W. Furnish and install approximately 370 LF 36” steel encasement pipe with 16” DR-18 C900 RJ PVC Sanitary Sewer to be installed by Bore and Jack within CSX R/W. Furnish and install approximately 30 LF of 8” RJ PC 350 DI water main to be installed by open cut. Furnish and install approximately 10 sanitary sewer manholes. Furnish and install approximately 1,600 LF of 8” to 12” RJ PC 350 DI water main to be installed by open cut. Associated pavement and surface restoration, erosion control, bypass pumping, and other appurtenances.
Addendum 1 (click to expand/collapse)