NC 54 Waterline Replacement
Construction of approx. 6,100 LF of 8- to 16-inch DI waterline, approx. 500 LF of 20-inch DIPS DR-9 HDPE directional drill, three trenchless crossings of NC-54, and additional associated work.
Drawings
(click to expand/collapse)

Name | Size | ||
NC-54 Waterline Replacement - Bid Construction Drawings - 20221121 | 79.4 MB |