Bass Lake Spillway

The work for the Town of Holly Springs Bass Lake Dam Spillway, TOHS Proj. # 21-005, includesthe construction of an auxiliary spillway, modifying the existing embankment, grading, and erosion control.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 1 1.3.25 263.4 KB