Bass Lake Spillway
The work for the Town of Holly Springs Bass Lake Dam Spillway, TOHS Proj. # 21-005, includesthe construction of an auxiliary spillway, modifying the existing embankment, grading, and erosion control.
Addendum 1
(click to expand/collapse)
Name | Size | ||
Addendum 1 1.3.25 | 263.4 KB |