Bass Lake Spillway
The work for the Town of Holly Springs Bass Lake Dam Spillway, TOHS Proj. # 21-005, includesthe construction of an auxiliary spillway, modifying the existing embankment, grading, and erosion control.
Project Manual
(click to expand/collapse)
Name | Size | ||
21-005 Bass Lake Spillway - POSTED 12.2.2024 | 6.0 MB |