Bass Lake Spillway

The work for the Town of Holly Springs Bass Lake Dam Spillway, TOHS Proj. # 21-005, includesthe construction of an auxiliary spillway, modifying the existing embankment, grading, and erosion control.
Drawings (click to expand/collapse)